FP-9
FP-9 is Fire Point's developmental Ukrainian ground-launched ballistic missile, with a claimed range of up to 850 km and payload of up to 800 kg. No flight or combat use is publicly documented as of 10 October 2026.
FP-9 is a Ukrainian ground-launched ballistic missile under development by Fire Point for operational-strategic conventional strike, with a manufacturer-claimed range of up to 850 km and payload of up to 800 kg.
Overview
FP-9 is the longer-range ballistic missile in Ukrainian private manufacturer Fire Point's strike portfolio. The company describes it as an operational-strategic weapon launched from a ground-based platform. Its product page claims a range of up to 850 km, an 800 kg payload and 20 m accuracy. These figures describe intended performance; independent verification is not publicly established.
The programme remains in development as of 10 October 2026. No FP-9 flight, test result or combat use is publicly documented in the available record. Chief executive Iryna Terekh described the missile as approaching a series of tests and set an end-of-autumn 2026 development target in an interview carried by UNITED24 Media.
FP-9 is a separate missile from Fire Point's shorter-range FP-7. Terekh described a substantially larger solid-propellant engine for FP-9 in her The War Zone interview. Its intended role would extend the company's ballistic strike capability beyond the tactical range associated with FP-7. The FP-9's service-entry date and eventual fielded performance depend on completing development and testing.
π The full FP-9 file is for BattlePolicy Pro members. Below the line: development history, design and capabilities, variants, the combat record, advantages and limitations, comparable systems, outlook, the full specifications table, our sourcing, and the analyst assessment: procurement, suppliers and the BattlePolicy verdict. Unlock the full file with BattlePolicy Pro β
Below this point
- Development
- Design & capabilities
- Combat record / operational use
- Advantages
- Drawbacks / limitations
- Counterparts
- Outlook
- Key specifications
- Sources
- Analyst Section
- Procurement & contracts
- Suppliers & related companies
- Comparable systems β analyst view
- Analyst note