The Boeing Company
Boeing's defense arm pairs a newly won next-generation fighter (F-47) with two carrier- and combat-relevant autonomous aircraft programs, MQ-25 Stingray and MQ-28 Ghost Bat, now entering production and weapons integration.
Background
The Boeing Company, founded in 1916 and headquartered in Arlington, Virginia, is one of the world's two dominant commercial aircraft manufacturers and a major U.S. defense prime.
Kelly Ortberg, who became President and CEO in August 2024, leads the parent company through an ongoing turnaround focused on stabilizing commercial production and finances; Steve Parker serves as President and CEO of the Boeing Defense, Space & Security (BDS) segment, which houses the company's military aircraft, autonomous systems and space programs.
BDS's most defense-tech-relevant current programs are the F-47 next-generation fighter, selected by the U.S.
Air Force in 2025 as the winner of the Next Generation Air Dominance (NGAD) competition, and two uncrewed aircraft: the MQ-25 Stingray carrier-based autonomous refueling drone (which completed Milestone C and its first operational taxi test in January 2026) and the MQ-28 Ghost Bat collaborative combat aircraft, developed originally for the Royal Australian Air Force and now being integrated with AIM-120 AMRAAM and marketed into the UK and Europe alongside a BAE Systems partnership.
Linked records
Wired to the rest of BattlePolicy — the systems it builds in the Lexicon and the contracts it wins in the Procurement Tracker. Every link below is a record in our own datasets.
- United States — AH-64E
- Poland — AH-64E
- Australia — AH-64E
- Saudi Arabia — AH-64E
- U.S. Air Force — B-52 Commercial Engine Replacement Program (CERP)
- United States — F-15EX
- United States — F-15EX
- Poland — Advanced Eagle
- US Navy (USA) — MQ-25A Stingray
- US Navy (USA) — MQ-25A Stingray
- Australia — MQ-28 Ghost Bat
- United Kingdom — AN/AAQ-24(V)N Large Aircraft Infrared Countermeasures (LAIRCM)
- Republic of Korea — KMU-557 and KMU-572 JDAM tail kits and guidance sets
- India — AH-64E Apache
- Ukraine — JDAM-ER (KMU-572 and KMU-556 tail kits) with FMU-139 fuze and support
- Republic of Korea — AH-64E Apache Upgrade Program
- Canada — C-17
- Singapore — P-8A maritime patrol aircraft and MK 54 lightweight torpedoes
- Israel — AH-64E Apache attack helicopters and related equipment
- Republic of Korea — GBU-39/B Small Diameter Bomb Increment I (SDB-I)
- Canada — Air Strike Weapons (GBU-39 SDB-I, GBU-53 SDB-II, JDAM, GP bombs)
- Israel — MK 83 and BLU-110 bomb bodies with KMU-559 JDAM guidance kits
- Denmark — P-8A Patrol Aircraft
- Japan — Munitions package for Japan FMS case JA-D-AAQ (GBU-39 SDB-I, GBU-53 SDB-II, JDAM tail kits, general purpose bombs, and associated non-MDE)
- Norway — GBU-39/B Small Diameter Bomb Increment I
- United Arab Emirates — CH-47F Chinook helicopters
- Israel — Joint Direct Attack Munition (JDAM) guidance kits: KMU-558B/B for BLU-109 and KMU-572 F/B for MK 82
- Australia — F/A-18F Super Hornet and EA-18G Growler fleet sustainment
- Poland — GBU-39/B Small Diameter Bomb (SDB-I)
- United Kingdom — C-17 Globemaster III aircraft fleet Contractor Logistics Support sustainment
- Romania — GBU-39B Small Diameter Bombs (SDB-I)
- Republic of Korea — E-7 Airborne Early Warning & Control (AEW&C) aircraft
- Kingdom of Morocco — GBU-39B Small Diameter Bomb I (SDB-I)
- Australia — C-17A Globemaster III Sustainment Partnership support
- Qatar — MQ-9B Remotely Piloted Aircraft and associated munitions, sensors, and support
- Japan — KC-46A Aerial Refueling Aircraft
- Australia — AH-64E Apache sustainment support services
- Israel — F-15IA and F-15I+ upgrade
- Canada — JDAM tail kits (KMU-572/556/557)
- United States — JOINT DIRECT ATTACK MUNITION (JDAM) AWARD OF LOT 22 DELIVERY ORDER FOR USAF AND USN.
- United States — LOT 20 DELIVERY ORDER ALL-UP-ROUNDS
- United States — JDAM LOT 29 DO
- United States — SMALL DIAMETER BOMB I LOT 19 ALL UP ROUND
- United States — JOINT DIRECT ATTACK MUNITION (JDAM)
- United States — SDB I LOT 13
- United States — STOKER 3.0 PROGRAM. A DELIVERY ORDER FOR JOINT DIRECT ATTACK MUNITIONS (JDAM) EXTENDED RAN
- United States — THE MISSILE DEFENSE AGENCY (MDA), GROUND-BASED MIDCOURSE DEFENSE (GMD) DEVELOPMENT AND SUS
- United States — GBI/AUR PROGRAM MANAGEMENT/SYSTEMS ENG
- United States — SLAM ER OBSOLESCENCE REDESIGN - NRE AND PRODUCTION OF SLAM ER MISSILES
- United States — HARPOON COASTAL DEFENSE SYSTEM FOR LAUNCHER TRANSPORTER UNITS (LTUS), RADAR UNITS (RUS) AN
- United States — LOT 91 PRODUCTION LONG LEAD ITEMS
- United States — MISSILE NRE
- United States — KC-X MODERNIZATION PROGRAM
- United States — USN P-8A FRP II LONG LEAD MATERIAL
- United States — (unspecified materiel)
- United States — PROCUREMENT OF V-22 LOT 17 LONG LEAD-TIME ITEMS
- United States — F-15, FMS, F-15QA AIR VEHICLE DEVELOPMENT
- United States — CMV-22 PRODUCTION LOT 22 LONG LEAD-TIME ITEMS
- United States — P-8A FRP LOT I LONG LEAD MATERIAL
- United States — F/A-18E AIRCRAFT
- United States — CH-47F CARGO HELICOPTER MULTIYEAR II. 34 NEW BUILD HELICOPTERS AND 121 RENEW HELICOPTERS.
- United States — ACAT I, AFLCMC/WLJK, PRESIDENTIAL AIRCRAFT RECAPITALIZATION
- United States — F-15EX LOT 5 ADVANCED PROCUREMENT
- United States — CANADA AND GERMANY LOT 13 P-8A AIRCRAFT
- United States — LOT 40 F/A-18E AND EA-18G AIRCRAFT WITH AEA KITS
- United States — E-7A RAPID PROTOTYPING
- United States — F-15EX - LOT 4 ADVANCED PROCUREMENT
- United States — 28 KUWAIT KAF-18E/F AIRCRAFT AND 56 COMMERCIAL PXMC CARDS
- United States — KC-46 FMS EFFORT FOR ISRAEL AIRCRAFT 5&6 AND JAPAN AIRCRAFT 7-10.
- United States — UH-1N REPLACEMENT HELICOPTER SYSTEM
- United States — F-15/NO ACAT/JAPAN/UNDEFINITIZED CONTRACT ACTION
- United States — JAPAN KC-46A
- United States — ADVANCE PROCUREMENT FOR LOTS 3 AND 4 OF APACHE BLOCK III FULL RATE PRODUCTION
- United States — B-52 COMMERCIAL ENGINE REPLACEMENT PROGRAM (CERP) RAPID PROTOTYPING 1 (RP1)
- United States — NON-RECURRING ENGINEERING AND AAE ITEMS IN SUPPORT OF KUWAIT VARIANT OF F/A-18 SUPER HORNE
- United States — F15EX LOT 2 LONG LEAD-ITEMS
- United States — F15EX LOT 1A AND LOT 1 NRE
- United States — F-15EX LOT 3 LONG-LEAD ITEMS
- United States — CH-47F BLOCK II AIRCRAFT WITH AIR TO AIR REFUELING INCLUSIVE OF ALL SERVICE, MATERIAL, PRO
- United States — ADVANCED PILOT TRAINING
- United States — KC-46 FMS ISRAEL AIRCRAFT 1-4
- United States — 200012!1700!001421!AC5J0 !NAVAL AIR SYSTEMS COMMAND !N0001900C0183 !A!*!*
- United States — F-15 ISRAEL PROGRAM
- United States — (unspecified materiel)
- United States — H-47 EXTENDED RANGE FMS PRODUCTION
- United States — B-52 RADAR MODERNIZATION PROGRAM ENGINEERING AND MANUFACTURING DEVELOPMENT
- United States — BLOCK 40/45 FULL RATE PRODUCTION JBP PHASE 3
- United States — MH-47G BLKII LOT 6 LONG LEAD PRODUCTION
- United States — MANUFACTURE OF HORIZONTAL STABLIZIERS, LEFT, RIGHT AND CENTER FOR THE KC -135 AIRCRAFT.
- United States — F-15 KOREA K+ FMS
- United States — CH-47 AIRCRAFT
- United States — MH-47G BLKII LOT 4 PRODUCTION
- United States — EVOLVED STRATEGIC SATELLITE COMMUNICATION (ESS) SPACE DEVELOPMENT AND PRODUCTION
- United States — JAPAN AWACS MISSION COMPUTING UPGRADE (MCU) PROGRAM DESIGN AND PRODUCTION
- United States — ACAT II, F-15, ADVANCED DISPLAY CORE PROCESSOR (ADCP) II PRODUCTION
- United States — CH-47F AIRCRAFT PROCUREMENT
- United States — ONE CH-47F NEW BUILD AIRCRAFT
- United States — F-15 CD&I OFP
- United States — PROCUREMENT OF NON-RECURRING DEVELOPMENT OF TECHNICAL INSERTIONS TO COMPLETE DEVELOPMENT O
- United States — V-22 NACELLE IMPROVEMENTS STEP 2
- United States — THIS EFFORT IS TO PURCHASE WINGS FOR THE A-10 THUNDERBOLT II ADVANCED-WING CONTINUATION KI
- United States — QF-16 FULL SCALE AERIAL TARGET (FSAT)
- United States — F-15, ACAT II, INFRARED SEARCH AND TRACK PODS INTEGRATION AND PRODUCTION
- United States — B-52 COMMERCIAL ENGINE REPALCEMENT PROGRAM RAPID PROTOTYPING MATERIAL
- United States — CH-47F BLOCK II PRODUCTION RENEW AIRCRAFT
- United States — REQUIREMENT CONTAINED WITHIN SECTION J - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENT
- United States — F-15; ACAT II: RMP/V3 COMBINED RADAR BUY FY15
- United States — V-22 PBL PERIOD OF PERFORMANCE 1 (1 JANUARY 2019 - 31 DECEMBER 2019)
- United States — NON-RECURRING ENGINEERING IN SUPPORT OF THE IMPLEMENTATION OF ECP 6 CAPABILITIES INTO THE
- United States — EAGLE TALON II/FULL RATE PRODUCTION 6-8 FISCAL YEAR 19-21
- United States — V-22 PERFORMANCE BASED LOGISTICS CONTRACT POP 3 (01/06/2024 - 01/05/2025)
- United States — V-22 PBL POP 4 (6 JAN 2025 - 5 JAN 2026)
- United States — F-15 EAGLE ACTIVE PASSIVE WARNING SURVIVABILITY SYSTEM (EPAWSS) FULL-RATE PRODUCTION (FRP)
- United States — V-22 PBL POP 5 (6 JAN 2026 - 5 JAN 2027)
- United States — ROYAL SAUDI AIRFORCE (RSAF) AIRBORNE WARNING AND CONTROL SYSTEM (AWACS) MODERNIZATION PROG
- United States — 17 F18 A-D FLIGHT CONTROL SURFACE NIINS
- United States — F-15 EAGLE PASSIVE/ACTIVE WARNING & SURVIVABILITY SYSTEM (EPAWSS) LOW RATE ININITIAL PRODU
- United States — ACAT I F-15 AIRCRAFT ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD) FOR THE INTEGRATED EL
- United Kingdom — Large Aircraft Infrared Countermeasures (LAIRCM) system
- Republic of Korea — KMU-557 and KMU-572 Joint Direct Attack Munitions (JDAM) tail kits and guidance sets
- India — AH-64E Apache sustainment support services
- Canada — P-8A Poseidon (Canadian Multi-Mission Aircraft, CMMA)
Financial footing
- BDS FY2025 revenue approximately $27.2B (roughly flat vs 2024's ~$26B) with an operating loss of about -$128M, reflecting continued fixed-price program pressure
- BDS Q1 2025 backlog was reported at $62B
- Total company backlog reached a record $695B in Q1 2026 (Boeing-wide, dominated by commercial aircraft orders)
- Q1 2026 BDS revenue was $7.6B with a 3.1% operating margin ($233M operating earnings) — a notable margin improvement versus prior losses
- The F-47/NGAD fighter award (2025) was, as of Q1 2025 reporting, not yet reflected in backlog pending source-selection completion
- No primary-source figure for its dollar value in backlog was found in this research pass and should be treated as unconfirmed
- MQ-25 moved into low-rate initial production in 2026 after Milestone C approval
- MQ-28 Ghost Bat completed AMRAAM integration in ~7 months (reported July 2026) and is being pitched to the UK alongside a BAE Systems partnership
- Backers: N/A — public company. Broad institutional ownership; no controlling shareholder. Company has raised capital via public equity/debt offerings in recent years to shore up its balance sheet amid commercial-aviation and defense program losses.
BDS generated approximately $27.2B in FY2025 revenue, roughly flat year-over-year, but posted an operating loss of about -$128M as legacy fixed-price development programs continued to weigh on margins. That trend improved into 2026: Q1 2026 BDS revenue reached $7.6B with a 3.1% operating margin ($233M operating earnings).
Boeing's total company backlog — commercial plus defense — hit a record $695B in Q1 2026, though the vast majority is commercial aircraft orders; BDS-specific backlog was last cited around $62B (Q1 2025). Boeing's overall market capitalization was approximately $164B as of late July 2026.
Major customers & contracts
Joined live from the Procurement & Contracts Tracker — real award/announcement records.
| Customer | System | Scale / detail | Status |
|---|---|---|---|
| United States | AH-64E | Unit price ~$30–35 million range | framework |
| Poland | AH-64E | — | signed |
| Australia | AH-64E | — | delivered |
| Saudi Arabia | AH-64E | — | option |
| U.S. Air Force | B-52 Commercial Engine Replacement Program (CERP) | contract to integrate Rolls-Royce F130 engines | signed |
| United States | F-15EX | contract ceiling up to $22.9 billion | framework |
| United States | F-15EX | first lot | delivered |
| Poland | Advanced Eagle | contract pricing unconfirmed | option |
| US Navy (USA) | MQ-25A Stingray | 805000000 | signed |
| US Navy (USA) | MQ-25A Stingray | modification to add 3 EDM aircraft, value not specified | signed |
| Australia | MQ-28 Ghost Bat | AUD 754 million | signed |
| United Kingdom | AN/AAQ-24(V)N Large Aircraft Infrared Countermeasures (LAIRCM) | Major Defense Equipment $69 million, Other $91 million | tender |
| Republic of Korea | KMU-557 and KMU-572 JDAM tail kits and guidance sets | Major Defense Equipment $60 million, other $46 million; total estimated cost | tender |
| India | AH-64E Apache | total estimated value | tender |
| Ukraine | JDAM-ER (KMU-572 and KMU-556 tail kits) with FMU-139 fuze and support | Major Defense Equipment $93.6 million, Other $280.0 million | tender |
| Republic of Korea | AH-64E Apache Upgrade Program | Major Defense Equipment $0.358 billion, Other $0.842 billion, Total $1.200 billion | tender |
| Canada | C-17 | 540000000 | tender |
| Singapore | P-8A maritime patrol aircraft and MK 54 lightweight torpedoes | Total estimated cost $2.316 billion; Major Defense Equipment $1.293 billion, Other $1.023 billion | tender |
| Israel | AH-64E Apache attack helicopters and related equipment | Major Defense Equipment $2.3 billion, Other $1.5 billion | tender |
| Republic of Korea | GBU-39/B Small Diameter Bomb Increment I (SDB-I) | Total estimated $111.8 million; MDE $106.8 million, Other $5.0 million | tender |
| Canada | Air Strike Weapons (GBU-39 SDB-I, GBU-53 SDB-II, JDAM, GP bombs) | Major Defense Equipment $2.20 billion, Other $0.48 billion | tender |
| Israel | MK 83 and BLU-110 bomb bodies with KMU-559 JDAM guidance kits | Total estimated $675.7M; Major Defense Equipment $557.5M, Other $118.2M | tender |
| Denmark | P-8A Patrol Aircraft | $1.8 billion total estimated value; $1.25 billion Major Defense Equipment | tender |
| Japan | Munitions package for Japan FMS case JA-D-AAQ (GBU-39 SDB-I, GBU-53 SDB-II, JDAM tail kits, general purpose bombs, and associated non-MDE) | $82 million total ($30 million major defense equipment, $52 million other) | tender |
| Norway | GBU-39/B Small Diameter Bomb Increment I | MDE: $107 million; Non-MDE: $6 million | tender |
| United Arab Emirates | CH-47F Chinook helicopters | Major Defense Equipment $0.65 billion, Other $0.67 billion | tender |
| Israel | Joint Direct Attack Munition (JDAM) guidance kits: KMU-558B/B for BLU-109 and KMU-572 F/B for MK 82 | Major Defense Equipment $500 million, Other $10 million | tender |
| Australia | F/A-18F Super Hornet and EA-18G Growler fleet sustainment | Major Defense Equipment $0.6 billion, Other $1.4 billion; includes 60 JTT-X, 40 Advanced Electronic Warfare systems, 24 Next Generation Electronic Attack Units, non-MDE items | tender |
| Poland | GBU-39/B Small Diameter Bomb (SDB-I) | Major Defense Equipment $110 million; Other $70 million | tender |
| United Kingdom | C-17 Globemaster III aircraft fleet Contractor Logistics Support sustainment | Total estimated cost $861M for equipment, services, spare parts, and modifications | tender |
| Romania | GBU-39B Small Diameter Bombs (SDB-I) | Total estimated $84 million; Major Defense Equipment $41 million, other $43 million | tender |
| Republic of Korea | E-7 Airborne Early Warning & Control (AEW&C) aircraft | Total estimated value $4.92 billion (Major Defense Equipment $2.75 billion, Other $2.17 billion) | tender |
| Kingdom of Morocco | GBU-39B Small Diameter Bomb I (SDB-I) | Major Defense Equipment $51 million, Other $35 million, Total $86 million | tender |
| Australia | C-17A Globemaster III Sustainment Partnership support | Estimated total value of new items; total case value revised to $4.88 billion | tender |
| Qatar | MQ-9B Remotely Piloted Aircraft and associated munitions, sensors, and support | Total estimated value $1.96 billion (Major Defense Equipment $0.34 billion, other $1.62 billion) | tender |
| Japan | KC-46A Aerial Refueling Aircraft | Major Defense Equipment $3.4 billion, Other $0.7 billion; total estimated $4.1 billion | tender |
| Australia | AH-64E Apache sustainment support services | estimated total cost | tender |
| Israel | F-15IA and F-15I+ upgrade | Total estimated cost $18.82 billion; Major Defense Equipment $9.29 billion, Other $9.53 billion | tender |
| Canada | JDAM tail kits (KMU-572/556/557) | Total $96.4 million; Major Defense Equipment $68.0 million, Other $28.4 million | tender |
| United States | JOINT DIRECT ATTACK MUNITION (JDAM) AWARD OF LOT 22 DELIVERY ORDER FOR USAF AND USN. | JOINT DIRECT ATTACK MUNITION (JDAM) AWARD OF LOT 22 DELIVERY ORDER FOR USAF AND USN. | signed |
| United States | LOT 20 DELIVERY ORDER ALL-UP-ROUNDS | LOT 20 DELIVERY ORDER ALL-UP-ROUNDS | signed |
| United States | JDAM LOT 29 DO | JDAM LOT 29 DO | signed |
| United States | SMALL DIAMETER BOMB I LOT 19 ALL UP ROUND | SMALL DIAMETER BOMB I LOT 19 ALL UP ROUND | signed |
| United States | JOINT DIRECT ATTACK MUNITION (JDAM) | JOINT DIRECT ATTACK MUNITION (JDAM) | signed |
| United States | SDB I LOT 13 | SDB I LOT 13 | signed |
| United States | STOKER 3.0 PROGRAM. A DELIVERY ORDER FOR JOINT DIRECT ATTACK MUNITIONS (JDAM) EXTENDED RAN | STOKER 3.0 PROGRAM. A DELIVERY ORDER FOR JOINT DIRECT ATTACK MUNITIONS (JDAM) EXTENDED RANGE WING KITS UNDER CONTRACT FA8213-24-D-B002. | signed |
| United States | THE MISSILE DEFENSE AGENCY (MDA), GROUND-BASED MIDCOURSE DEFENSE (GMD) DEVELOPMENT AND SUS | THE MISSILE DEFENSE AGENCY (MDA), GROUND-BASED MIDCOURSE DEFENSE (GMD) DEVELOPMENT AND SUSTAINMENT CONTRACT (DSC) THE GMD DSC WORK INCLUDES, BUT IS NOT LIMITED TO: 1) FUTURE DEVELOPMENT; 2) FIELDING; 3) TEST; 4) SYSTEMS ENGINEERING, INTEGRATION AND CONFIGURATION MANAGEMENT; 5) EQUIPMENT MANUFACTURING AND REFURBISHMENT; 6) TRAINING; AND 7) OPERATIONS AND SUSTAINMENT SUPPORT FOR THE GMD WEAPON SYSTEM AND ASSOCIATED SUPPORT FACILITIES. | signed |
| United States | GBI/AUR PROGRAM MANAGEMENT/SYSTEMS ENG | GBI/AUR PROGRAM MANAGEMENT/SYSTEMS ENG | signed |
| United States | SLAM ER OBSOLESCENCE REDESIGN - NRE AND PRODUCTION OF SLAM ER MISSILES | SLAM ER OBSOLESCENCE REDESIGN - NRE AND PRODUCTION OF SLAM ER MISSILES | signed |
| United States | HARPOON COASTAL DEFENSE SYSTEM FOR LAUNCHER TRANSPORTER UNITS (LTUS), RADAR UNITS (RUS) AN | HARPOON COASTAL DEFENSE SYSTEM FOR LAUNCHER TRANSPORTER UNITS (LTUS), RADAR UNITS (RUS) AND TRAINING EQUIPMENT. | signed |
| United States | LOT 91 PRODUCTION LONG LEAD ITEMS | LOT 91 PRODUCTION LONG LEAD ITEMS | signed |
| United States | MISSILE NRE | MISSILE NRE | signed |
| United States | KC-X MODERNIZATION PROGRAM | KC-X MODERNIZATION PROGRAM | signed |
| United States | USN P-8A FRP II LONG LEAD MATERIAL | USN P-8A FRP II LONG LEAD MATERIAL | signed |
| United States | (unspecified materiel) | 7633729888 | signed |
| United States | PROCUREMENT OF V-22 LOT 17 LONG LEAD-TIME ITEMS | PROCUREMENT OF V-22 LOT 17 LONG LEAD-TIME ITEMS | signed |
| United States | F-15, FMS, F-15QA AIR VEHICLE DEVELOPMENT | F-15, FMS, F-15QA AIR VEHICLE DEVELOPMENT | signed |
| United States | CMV-22 PRODUCTION LOT 22 LONG LEAD-TIME ITEMS | CMV-22 PRODUCTION LOT 22 LONG LEAD-TIME ITEMS | signed |
| United States | P-8A FRP LOT I LONG LEAD MATERIAL | P-8A FRP LOT I LONG LEAD MATERIAL | signed |
| United States | F/A-18E AIRCRAFT | F/A-18E AIRCRAFT | signed |
| United States | CH-47F CARGO HELICOPTER MULTIYEAR II. 34 NEW BUILD HELICOPTERS AND 121 RENEW HELICOPTERS. | CH-47F CARGO HELICOPTER MULTIYEAR II. 34 NEW BUILD HELICOPTERS AND 121 RENEW HELICOPTERS. | signed |
| United States | ACAT I, AFLCMC/WLJK, PRESIDENTIAL AIRCRAFT RECAPITALIZATION | ACAT I, AFLCMC/WLJK, PRESIDENTIAL AIRCRAFT RECAPITALIZATION | signed |
| United States | F-15EX LOT 5 ADVANCED PROCUREMENT | F-15EX LOT 5 ADVANCED PROCUREMENT | signed |
| United States | CANADA AND GERMANY LOT 13 P-8A AIRCRAFT | CANADA AND GERMANY LOT 13 P-8A AIRCRAFT | signed |
| United States | LOT 40 F/A-18E AND EA-18G AIRCRAFT WITH AEA KITS | LOT 40 F/A-18E AND EA-18G AIRCRAFT WITH AEA KITS | signed |
| United States | E-7A RAPID PROTOTYPING | E-7A RAPID PROTOTYPING | signed |
| United States | F-15EX - LOT 4 ADVANCED PROCUREMENT | F-15EX - LOT 4 ADVANCED PROCUREMENT | signed |
| United States | 28 KUWAIT KAF-18E/F AIRCRAFT AND 56 COMMERCIAL PXMC CARDS | 28 KUWAIT KAF-18E/F AIRCRAFT AND 56 COMMERCIAL PXMC CARDS | signed |
| United States | KC-46 FMS EFFORT FOR ISRAEL AIRCRAFT 5&6 AND JAPAN AIRCRAFT 7-10. | KC-46 FMS EFFORT FOR ISRAEL AIRCRAFT 5&6 AND JAPAN AIRCRAFT 7-10. | signed |
| United States | UH-1N REPLACEMENT HELICOPTER SYSTEM | UH-1N REPLACEMENT HELICOPTER SYSTEM | signed |
| United States | F-15/NO ACAT/JAPAN/UNDEFINITIZED CONTRACT ACTION | F-15/NO ACAT/JAPAN/UNDEFINITIZED CONTRACT ACTION | signed |
| United States | JAPAN KC-46A | JAPAN KC-46A | signed |
| United States | ADVANCE PROCUREMENT FOR LOTS 3 AND 4 OF APACHE BLOCK III FULL RATE PRODUCTION | ADVANCE PROCUREMENT FOR LOTS 3 AND 4 OF APACHE BLOCK III FULL RATE PRODUCTION | signed |
| United States | B-52 COMMERCIAL ENGINE REPLACEMENT PROGRAM (CERP) RAPID PROTOTYPING 1 (RP1) | B-52 COMMERCIAL ENGINE REPLACEMENT PROGRAM (CERP) RAPID PROTOTYPING 1 (RP1) | signed |
| United States | NON-RECURRING ENGINEERING AND AAE ITEMS IN SUPPORT OF KUWAIT VARIANT OF F/A-18 SUPER HORNE | NON-RECURRING ENGINEERING AND AAE ITEMS IN SUPPORT OF KUWAIT VARIANT OF F/A-18 SUPER HORNET | signed |
| United States | F15EX LOT 2 LONG LEAD-ITEMS | F15EX LOT 2 LONG LEAD-ITEMS | signed |
| United States | F15EX LOT 1A AND LOT 1 NRE | F15EX LOT 1A AND LOT 1 NRE | signed |
| United States | F-15EX LOT 3 LONG-LEAD ITEMS | F-15EX LOT 3 LONG-LEAD ITEMS | signed |
| United States | CH-47F BLOCK II AIRCRAFT WITH AIR TO AIR REFUELING INCLUSIVE OF ALL SERVICE, MATERIAL, PRO | CH-47F BLOCK II AIRCRAFT WITH AIR TO AIR REFUELING INCLUSIVE OF ALL SERVICE, MATERIAL, PRODUCTION, AND MANUFACTURING FOR GERMANY, GY-B-XBT | signed |
| United States | ADVANCED PILOT TRAINING | ADVANCED PILOT TRAINING | signed |
| United States | KC-46 FMS ISRAEL AIRCRAFT 1-4 | KC-46 FMS ISRAEL AIRCRAFT 1-4 | signed |
| United States | 200012!1700!001421!AC5J0 !NAVAL AIR SYSTEMS COMMAND !N0001900C0183 !A!*!* | 200012!1700!001421!AC5J0 !NAVAL AIR SYSTEMS COMMAND !N0001900C0183 !A!*!* !20000620!20031031!172316432!009256819!009256819!N!77272!THE BOEING COMPANY !ROUTE 291 & STEWART AVE. !RIDLEY PARK !PA!19078!03000!375!48!AMARILLO !POTTER !TEXAS !0001!+000067322589!N!N!000000000000!1510!AIRCRAFT FIXED WING !A1A!AIRFRAMES AND SPARES !2AVQ!V22 VERTICAL LIFT AIRCRAFT !3721!1!*!*!*!B!A!*!D !N!L!1!001!N!1A!A!N!A!* !* !N!C!*!A!A!A!A!A!A!* !*!N!A!C!N!*!*!*!Y!*! | signed |
| United States | F-15 ISRAEL PROGRAM | F-15 ISRAEL PROGRAM | signed |
| United States | (unspecified materiel) | 822396261 | signed |
| United States | H-47 EXTENDED RANGE FMS PRODUCTION | H-47 EXTENDED RANGE FMS PRODUCTION | signed |
| United States | B-52 RADAR MODERNIZATION PROGRAM ENGINEERING AND MANUFACTURING DEVELOPMENT | B-52 RADAR MODERNIZATION PROGRAM ENGINEERING AND MANUFACTURING DEVELOPMENT | signed |
| United States | BLOCK 40/45 FULL RATE PRODUCTION JBP PHASE 3 | BLOCK 40/45 FULL RATE PRODUCTION JBP PHASE 3 | signed |
| United States | MH-47G BLKII LOT 6 LONG LEAD PRODUCTION | MH-47G BLKII LOT 6 LONG LEAD PRODUCTION | signed |
| United States | MANUFACTURE OF HORIZONTAL STABLIZIERS, LEFT, RIGHT AND CENTER FOR THE KC -135 AIRCRAFT. | MANUFACTURE OF HORIZONTAL STABLIZIERS, LEFT, RIGHT AND CENTER FOR THE KC -135 AIRCRAFT. | signed |
| United States | F-15 KOREA K+ FMS | F-15 KOREA K+ FMS | signed |
| United States | CH-47 AIRCRAFT | CH-47 AIRCRAFT | signed |
| United States | MH-47G BLKII LOT 4 PRODUCTION | MH-47G BLKII LOT 4 PRODUCTION | signed |
| United States | EVOLVED STRATEGIC SATELLITE COMMUNICATION (ESS) SPACE DEVELOPMENT AND PRODUCTION | EVOLVED STRATEGIC SATELLITE COMMUNICATION (ESS) SPACE DEVELOPMENT AND PRODUCTION | signed |
| United States | JAPAN AWACS MISSION COMPUTING UPGRADE (MCU) PROGRAM DESIGN AND PRODUCTION | JAPAN AWACS MISSION COMPUTING UPGRADE (MCU) PROGRAM DESIGN AND PRODUCTION | signed |
| United States | ACAT II, F-15, ADVANCED DISPLAY CORE PROCESSOR (ADCP) II PRODUCTION | ACAT II, F-15, ADVANCED DISPLAY CORE PROCESSOR (ADCP) II PRODUCTION | signed |
| United States | CH-47F AIRCRAFT PROCUREMENT | CH-47F AIRCRAFT PROCUREMENT | signed |
| United States | ONE CH-47F NEW BUILD AIRCRAFT | ONE CH-47F NEW BUILD AIRCRAFT | signed |
| United States | F-15 CD&I OFP | F-15 CD&I OFP | signed |
| United States | PROCUREMENT OF NON-RECURRING DEVELOPMENT OF TECHNICAL INSERTIONS TO COMPLETE DEVELOPMENT O | PROCUREMENT OF NON-RECURRING DEVELOPMENT OF TECHNICAL INSERTIONS TO COMPLETE DEVELOPMENT OF THE BASE LINE AH-64E, AND FOR THE INTEGRATION OF MODIFICATIONS. | signed |
| United States | V-22 NACELLE IMPROVEMENTS STEP 2 | V-22 NACELLE IMPROVEMENTS STEP 2 | signed |
| United States | THIS EFFORT IS TO PURCHASE WINGS FOR THE A-10 THUNDERBOLT II ADVANCED-WING CONTINUATION KI | THIS EFFORT IS TO PURCHASE WINGS FOR THE A-10 THUNDERBOLT II ADVANCED-WING CONTINUATION KIT (ATTACK) PROGRAM FROM THE A-10 AIRCRAFT. | signed |
| United States | QF-16 FULL SCALE AERIAL TARGET (FSAT) | QF-16 FULL SCALE AERIAL TARGET (FSAT) | signed |
| United States | F-15, ACAT II, INFRARED SEARCH AND TRACK PODS INTEGRATION AND PRODUCTION | F-15, ACAT II, INFRARED SEARCH AND TRACK PODS INTEGRATION AND PRODUCTION | signed |
| United States | B-52 COMMERCIAL ENGINE REPALCEMENT PROGRAM RAPID PROTOTYPING MATERIAL | B-52 COMMERCIAL ENGINE REPALCEMENT PROGRAM RAPID PROTOTYPING MATERIAL | signed |
| United States | CH-47F BLOCK II PRODUCTION RENEW AIRCRAFT | CH-47F BLOCK II PRODUCTION RENEW AIRCRAFT | signed |
| United States | REQUIREMENT CONTAINED WITHIN SECTION J - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENT | REQUIREMENT CONTAINED WITHIN SECTION J - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS | signed |
| United States | F-15; ACAT II: RMP/V3 COMBINED RADAR BUY FY15 | F-15; ACAT II: RMP/V3 COMBINED RADAR BUY FY15 | signed |
| United States | V-22 PBL PERIOD OF PERFORMANCE 1 (1 JANUARY 2019 - 31 DECEMBER 2019) | V-22 PBL PERIOD OF PERFORMANCE 1 (1 JANUARY 2019 - 31 DECEMBER 2019) | signed |
| United States | NON-RECURRING ENGINEERING IN SUPPORT OF THE IMPLEMENTATION OF ECP 6 CAPABILITIES INTO THE | NON-RECURRING ENGINEERING IN SUPPORT OF THE IMPLEMENTATION OF ECP 6 CAPABILITIES INTO THE P-8 PLATFORM | signed |
| United States | EAGLE TALON II/FULL RATE PRODUCTION 6-8 FISCAL YEAR 19-21 | EAGLE TALON II/FULL RATE PRODUCTION 6-8 FISCAL YEAR 19-21 | signed |
| United States | V-22 PERFORMANCE BASED LOGISTICS CONTRACT POP 3 (01/06/2024 - 01/05/2025) | V-22 PERFORMANCE BASED LOGISTICS CONTRACT POP 3 (01/06/2024 - 01/05/2025) | signed |
| United States | V-22 PBL POP 4 (6 JAN 2025 - 5 JAN 2026) | V-22 PBL POP 4 (6 JAN 2025 - 5 JAN 2026) | signed |
| United States | F-15 EAGLE ACTIVE PASSIVE WARNING SURVIVABILITY SYSTEM (EPAWSS) FULL-RATE PRODUCTION (FRP) | F-15 EAGLE ACTIVE PASSIVE WARNING SURVIVABILITY SYSTEM (EPAWSS) FULL-RATE PRODUCTION (FRP) | signed |
| United States | V-22 PBL POP 5 (6 JAN 2026 - 5 JAN 2027) | V-22 PBL POP 5 (6 JAN 2026 - 5 JAN 2027) | signed |
| United States | ROYAL SAUDI AIRFORCE (RSAF) AIRBORNE WARNING AND CONTROL SYSTEM (AWACS) MODERNIZATION PROG | ROYAL SAUDI AIRFORCE (RSAF) AIRBORNE WARNING AND CONTROL SYSTEM (AWACS) MODERNIZATION PROGRAM (RAMP) PHASE I | signed |
| United States | 17 F18 A-D FLIGHT CONTROL SURFACE NIINS | 17 F18 A-D FLIGHT CONTROL SURFACE NIINS | signed |
| United States | F-15 EAGLE PASSIVE/ACTIVE WARNING & SURVIVABILITY SYSTEM (EPAWSS) LOW RATE ININITIAL PRODU | F-15 EAGLE PASSIVE/ACTIVE WARNING & SURVIVABILITY SYSTEM (EPAWSS) LOW RATE ININITIAL PRODUCTION (LRIP) | signed |
| United States | ACAT I F-15 AIRCRAFT ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD) FOR THE INTEGRATED EL | ACAT I F-15 AIRCRAFT ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD) FOR THE INTEGRATED ELECTRONIC WARFARE SUITE A.K.A EAGLE PASSIVE ACTIVE WARNING SURVIVABILITY SYSTEM (EPAWSS) | signed |
| United Kingdom | Large Aircraft Infrared Countermeasures (LAIRCM) system | MDE $69M, non-MDE $91M | tender |
| Republic of Korea | KMU-557 and KMU-572 Joint Direct Attack Munitions (JDAM) tail kits and guidance sets | Major Defense Equipment $60 million, Other $46 million | tender |
| India | AH-64E Apache sustainment support services | Estimated total cost | tender |
| Canada | P-8A Poseidon (Canadian Multi-Mission Aircraft, CMMA) | CAD 10.4 billion | signed |
Further disclosed customers & programs (public reporting):
BDS's primary customer is the U.S. Department of Defense — the U.S. Air Force (F-47, T-7 Red Hawk), U.S. Navy (MQ-25 Stingray, F/A-18) and U.S.
Army (Apache, Chinook) — supplemented by allied governments including Australia (MQ-28 Ghost Bat's original customer), the UK and other NATO/European buyers now being courted for MQ-28, training systems and other defense exports as Boeing pushes to grow international defense business.
Leadership & contact surface
Leadership: Kelly Ortberg (President & CEO, The Boeing Company); Steve Parker (President & CEO, Boeing Defense, Space & Security segment)
Official site: https://www.boeing.com
Competitive position
Within the U.S. prime cohort, Boeing competes most directly with Lockheed Martin and Northrop Grumman on fighter and next-gen-aircraft programs, and its MQ-25/MQ-28 lines put it in direct competition with a wave of venture-backed autonomous-aircraft and collaborative-combat-aircraft startups this directory otherwise covers.
Boeing's relevance to that startup cohort is twofold: a cautionary tale on execution risk (its defense unit has absorbed billions in fixed-price program losses) and a live case study in how a legacy prime is trying to build genuinely new autonomy capability (MQ-25, MQ-28) rather than only sustaining legacy platforms.
Battlefield relevance
No confirmed direct Ukraine battlefield deployment of Boeing-built systems was identified in this research pass.
Boeing's forward relevance to Ukraine/Europe coverage is programmatic rather than combat-proven today: MQ-28 Ghost Bat's rapid weapons-integration timeline and push into the UK/Europe, and the F-47's eventual fielding, are the developments to track as NATO air forces modernize; legacy Boeing platforms (Apache and Chinook helicopters, KC-46 tankers) remain in service with U.S. and allied militaries supporting the broader war effort indirectly.
Sources & verification
- Boeing to Release Second Quarter Results on July 28
- Boeing Has a $695B Backlog and Analysts See 29% Upside
- Boeing stock trades mixed as 737 MAX output and defense margins shape investor focus
- Podcast: How Steve Parker Is Remaking Boeing's Defense Business
- Boeing Debuts MQ-28 Ghost Bat Drone in Europe as UK Advances Collaborative Combat Aircraft Plans
- Boeing's MQ-28 and MQ-25 advance toward operational service
- MQ-25 Stingray | Boeing
- Boeing CEO says company still needs 'a couple more years' to repair balance sheet